Skip to content
2026 pilot: one company at a time
The Ark of ISOFrom zero to certified

Four steps, one file.

The Ark of ISO works with you on your company, with your processes and your documents. This is what happens from day one to the audit rehearsal.

System active · test company Persianas y Ambientes del Café S.A.S. Fictional company · Colombia · ISO 9001:2015
45678910
Readiness69 %+6 points this week
Gaps closed42/6119 open, all with an owner
Stage 1Marchestimated · 5 months from zero
Drafted the Quality Policypending approval
Found 3 gaps in clause 8.5.1
Closed the Stage 1 rehearsal nonconformityNC-02
Step 01

Map your context

You start by telling TAoI how your company works, in your own words and with whatever you already have written.

Processes, scope, interested parties, sites, products. If you arrive with a half-finished manual, an old policy or a risk spreadsheet, they are loaded and reused: the first run gives you a documentation readiness index, so you complete instead of starting over.

The result is the context of the organization (clause 4) written in your manager's own words.

Documentation readiness index
What already exists31 %
  • Loaded Quality manual v2 (2023)
  • Loaded Risk matrix in Excel
  • Missing Approved quality policy
  • Missing Cutting process characterization
Step 02

Measure the gap

Requirement by requirement, with four states and an owner for every gap.

TAoI goes through the chosen standard's catalogue and marks each requirement as compliant, in progress, gap or observation. Every gap gets an owner, a date and the evidence that would close it. The onboard panel summarizes progress by clause and by standard.

If you work with two standards, the shared core is measured only once.

4Context of the organizationCompliant
5LeadershipCompliant
6PlanningIn progress
7SupportIn progress
8OperationGap
9Performance evaluationGap
10ImprovementObservation
Step 03

Draft and approve

Every document is born as a draft. A person approves it and the approval is recorded.

Policies, procedures, process characterizations, the Statement of Applicability, the internal audit plan. TAoI drafts them from your context and traces them to the requirement they meet. You review, adjust and approve them; the approval record (who, when, which version) is what the auditor asks for under clause 7.5.

Nothing is published without a human sign-off. It is the house rule.

Clause 7.5 · GovernanceTAoI proposes, a human approves.Every draft is approved by a person and the approval is recorded
Approval queue
  • Quality Policy v1 · draftTo approve
  • Cutting procedure v3Approved · M. Cano
  • Risk matrix v2Approved · J. Ríos
Step 04

Rehearse the audit

Stage 1 and Stage 2 rehearsals with findings written the way an auditor writes them.

Before the certification body arrives, TAoI walks through your system the way an auditor would: asks for evidence, samples records and writes each finding with criterion, evidence and statement. You close the findings with actions and owners, and the rehearsal repeats until no findings remain open.

After the certificate, the same file supports annual surveillance audits and recertification.

NC-02 · Stage 1 rehearsalMinor NC
Clause
7.5.3 · Control of documented information
Criterion
Only the current version available at the point of use.
Evidence
Two printed copies of version 1 on the shop floor; version 3 is current.
Statement
Availability of the current version of the cutting procedure is not ensured.
Action
Remove copies, post v3 at the point of use. Owner: J. Ríos · due in 12 days.

What you get.

A complete file, approved by your people and ready for the auditor. Everything exportable in Document format (PDF) with traceability to every clause.

System documentation

  • Context, scope and interested parties
  • Policies and objectives
  • Process characterizations and procedures
  • Risk and opportunity matrix

What is specific to each standard

  • Statement of Applicability (27001, 42001)
  • Asset or AI system inventory
  • Impact assessment (27701, 42001)
  • Internal audit programme

Audit evidence

  • Stage 1 and 2 rehearsal report
  • Findings with actions and closure
  • Management review
  • Approval log (7.5)

The risk matrix has its own tool.

Assessment, controls, residual risk and treatment plans are worked in Risk, with its own log and reports. It serves your management system and also works on its own.

For consultants

Several companies, one view.

If you support several companies, TAoI gives you a portfolio: each one's progress, overdue gaps and the documents waiting for your judgement. Your time goes to professional judgement.

Persianas y Ambientes del Café69 %
Company B · 2700144 %
Company C · 2770112 %

Portfolio view with the test company and two examples.

Frequently asked questions

Do I need to know ISO to start?
No. The first step is done in your own words. If you want to understand the map first, the Ark School explains it in plain language.
What happens to my data and documents?
They are yours. They are used only to build your system and do not train third-party models. The full terms will be in the pilot agreement.
How many people from my company need to take part?
One person who knows the operation and another with authority to approve. In an SME that is usually the quality lead and the general manager.

Ready to set sail?

The 2026 pilot onboards one company at a time. Leave your email and we will write when your seat opens.